OK guys I know some of you are pretty sharp, so maybe you can help me out here. On the farm next to my place they started a MS Well. (Devinney Unit, 585' from my water well) Started the pad in November, started Drilling Jan 21,2012, I believe. Quit Drill Feb 5, 2012 and have since removed everything, except for a Dozer, Sheep'sfoot, Two roller and Two articulating dumptrucks. There remains a single bore hole and a railing around it. That's it. Tankers, rolloffs everything else is gone.
Now there are suppose to be four wells each going in different direction approx. 13,000 long each. I don't know why they stopped, but they did. Here's where it gets interesting...
Today was pretty nice as March days go, so I'm doing stuff out side blah, blah, blah... So I eventually walk up behind my place and I here a humming. It was comming from the well pad so I go have a look. There is a residual waste truck discharging into the bore hole. WTF? I ran down to the house grabbed the camers and the binoculars and went back. Mr. First Class Energy from Kittanning PA wastes no time getting the hell out of there. I'll post a few pics tomorrow. After I call DEP.
Now there are suppose to be four wells each going in different direction approx. 13,000 long each. I don't know why they stopped, but they did. Here's where it gets interesting...
Today was pretty nice as March days go, so I'm doing stuff out side blah, blah, blah... So I eventually walk up behind my place and I here a humming. It was comming from the well pad so I go have a look. There is a residual waste truck discharging into the bore hole. WTF? I ran down to the house grabbed the camers and the binoculars and went back. Mr. First Class Energy from Kittanning PA wastes no time getting the hell out of there. I'll post a few pics tomorrow. After I call DEP.