Register now on PaFlyFish.com! Login
HOME FORUM BLOG PHOTOS LINKS


Sponsors

Browsing this Thread:   1 Anonymous Users



« 1 (2)


Re: How to get long leader to turn over with 2 wt rod.

Joined:
2006/11/2 8:50
Posts: 1502
Offline
For a size 10 Wulff, you should be using 4x tippet.

The 6x tippet is too thin to transfer the energy of the fly line enough to turn over that big, air resistant fly.







Posted on: 2017/9/20 6:49


Re: How to get long leader to turn over with 2 wt rod.

Joined:
2006/9/10 21:53
From Greensburg, PA
Posts: 571
Offline
unless the fish laugh at your 4x and won't take anything bigger than 6x.

Posted on: 2017/9/20 7:34


Re: How to get long leader to turn over with 2 wt rod.

Joined:
2006/9/9 11:22
From New Castle, PA
Posts: 350
Offline
Quote:

tomgamber wrote:
unless the fish laugh at your 4x and won't take anything bigger than 6x.


Be sure to post a trip report the next time you encounter fish eating #10 dries but being so selective that 6x is required.


Posted on: 2017/9/20 8:46


Re: How to get long leader to turn over with 2 wt rod.

Joined:
2006/9/10 21:53
From Greensburg, PA
Posts: 571
Offline
about 8000 ft in central idaho...usually a 12 but...and it'd be 7x

Attach file:



jpg  426172.jpg (122.79 KB)
49_59c27067de4ff.jpg 500X332 px

Posted on: 2017/9/20 9:10

Edited by tomgamber on 2017/9/20 9:43:07


Re: How to get long leader to turn over with 2 wt rod.

Joined:
2010/8/4 11:18
Posts: 595
Offline
You sure those fish wouldn't take a #16?

Posted on: 2017/9/20 10:59


Re: How to get long leader to turn over with 2 wt rod.

Joined:
2006/9/10 21:53
From Greensburg, PA
Posts: 571
Offline
MOSTLY...DEPENDS IF I HAVE ANY LEFT OR IF THEY'RE ALL IN THE TREES...

Posted on: 2017/9/20 11:10


Re: How to get long leader to turn over with 2 wt rod.

Joined:
2010/8/4 11:18
Posts: 595
Offline
LOL. Got ya.

Posted on: 2017/9/20 12:03


Re: How to get long leader to turn over with 2 wt rod.

Joined:
2011/4/12 8:04
From Whitehall, PA
Posts: 6
Offline
A few years ago I was fishing a new four weight bamboo fly rod. The DT4 line and leader I use on my fast action graphite rod wasn't working out. My loops were good but the leader would collapse, failing to roll the fly out there. Research on the bamboo forum led me to a statement that "the stiffness of the leader butt section should be equal to the stiffness of the fly line tip section". The butt section of my leader was way more stiff than the fly line, I assume killing the energy from my fly line. So I quickly built out a leader beginning with a 15 pound butt section. Problem solved. Energy from the fly line now transitions to the leader much better. Need to carry special leaders for bamboo, but not a big deal.

Posted on: 2017/9/22 19:41


Re: How to get long leader to turn over with 2 wt rod.

Joined:
2006/9/9 22:43
From Delaware Co.
Posts: 517
Online
Sorry I have to ask why a 2 wt ? I'm sure you could accomplish the same fishing with a 3 or a 4 wt ?

Posted on: 2017/9/25 9:12
_________________
Fish where the fish are "
- Jack Gartside -


Re: How to get long leader to turn over with 2 wt rod.

Joined:
2007/5/29 14:32
From SE PA - Montgomery County
Posts: 185
Offline
I never understood that 2wt rod concept either. I have a 7'-6" 4 wt. rod that is perfect for the tightest streams and smallest fish. Also, if you are on a small stream a 7' leader is all you really need or want for that matter to allow for casting without getting hung up in the trees. Any longer leader works much better with a 4-5 wt rod.


Posted on: 2017/9/25 15:41


Re: How to get long leader to turn over with 2 wt rod.

Joined:
2013/9/6 11:40
From Westmoreland Cty
Posts: 169
Offline
I love 2 weights :)

Posted on: 2017/9/25 21:35
_________________
.


Re: How to get long leader to turn over with 2 wt rod.

Joined:
2016/8/25 16:10
Posts: 36
Offline
I got the 2 wt rod (Sage Circa) because it was a smoking hot deal and thought it would be good for small streams and drys. I never fished dry flies much in the past, usually nymphs or streamers. I have 7-1/2' and 10' 3 wt rods. The 7-1/2' is pretty fast and has never seemed very good for small dries. The 10' rod is a bear getting through the brush. I have a 9' 4 wt but it is real fast. I agree the 2 wt is whimpy, however, it is light as a feather and a joy to cast in close.

Posted on: 2017/9/28 14:11


Re: How to get long leader to turn over with 2 wt rod.

Joined:
2010/6/19 16:43
From Clinton County, Pa.
Posts: 227
Offline
Quote:

LetortAngler wrote:
I love 2 weights :)
Me too, I own two of them. I use mine for midge/tricos when fishing low clear limestoners.

Posted on: 2017/9/28 19:03
_________________
"Even the thousandth trip to the same familiar stream begins with renewed hope and unfailing faith." ZANE GREY



« 1 (2)



You can view topic.
You cannot start a new topic.
You cannot reply to posts.
You cannot edit your posts.
You cannot delete your posts.
You cannot add new polls.
You cannot vote in polls.
You cannot attach files to posts.
You cannot post without approval.

[Advanced Search]





Site Content
Login
Sponsors
Stay Connected

twitterfeed.com facebook instagram RSS Feed

USGS Water Levels
Polls
Angling Trade E-Survey: How Many Outdoor Print Magazines Do You Subscribe To?
None. Nada. Zip. 50% (46)
One or two. 32% (30)
Three or four. 13% (12)
More than four. 3% (3)
_PL_TOTALVOTES
The poll closed at 2017/10/27 11:42
Comments?





Copyright 2017 by PaFlyFish.com | Privacy Policy| Provided by Kile Media Group | Design by 7dana.com